The objective of the procurement process is to replace the Employer's damaged steam turbine with a new steam turbine driven generator set. The new machinery with auxiliary systems shall be installed in the same location as the old machine. Steam production will remain unchanged from original design. New foundations will be made by the Employer according to contractor footprint, load, and other interface information. Klikk her https://permalink.mercell.com/166448605.aspx

Slipp å lese og skrive alt selv, la Cobrief gjøre det for deg!

Prøv Cobrief Pro

Om anbudet

    The objective of the procurement process is to replace the Employer's damaged steam turbine with a new steam turbine driven generator set. The new machinery with auxiliary systems shall be installed in the same location as the old machine. Steam production will remain unchanged from original design. New foundations will be made by the Employer according to contractor footprint, load, and other interface information. Klikk her https://permalink.mercell.com/166448605.aspx

    Kontakt navn
    Halvor Wang Opaas
    Adresse
    Retirovegen 4, 6019 ÅLESUND

Kvalifikasjonskrav

    Leverandøren må være et lovlig registrert selskap.

    Leverandøren må ha en tilfredsstillende kredittvurdering.

    Leverandøren må ha tilstrekkelig økonomisk evne til å gjennomføre avtalen.

    Leverandøren må kunne vise til referanseprosjekter av sammenlignbar størrelse og konfigurasjon.

    Leverandøren må beskrive hvordan de er organisert for å oppfylle denne kontrakten.

    Leverandøren skal ha et tilfredsstillende kvalitetsstyringssystem.

    Leverandøren skal ha et tilfredsstillende miljøstyringssystem.

Se hele utlysningen

Tittel
6 MW Steam turbine driven generator set
Varighet
120 måneder

Tidslinje