Anbudsoversikt for 6 MW Steam turbine driven generator set

Utgått

Konkurransen er utgått uten at vinner er annonsert.

Brief

The objective of the procurement process is to replace the Employer's damaged steam turbine with a new steam turbine driven generator set. The new machinery with auxiliary systems shall be installed in the same location as the old machine. Steam production will remain unchanged from original design. New foundations will be made by the Employer according to contractor footprint, load, and other interface information. Klikk her https://permalink.mercell.com/166448605.aspx

Slipp å lese og skrive alt selv, la Cobrief gjøre det for deg!

Prøv Cobrief Pro

Om anbudet

Se hele utlysningen

Tittel
6 MW Steam turbine driven generator set
Kategori (CPV)
Varighet
120 måneder
Kvalifikasjonskrav 1

Qualification requirement: The Contractor must be a legally registered company. Documentation requirement: Company certificate or equivalent documentation indicating that the Contractor is registered with a trade register in his homeland.
Kvalifikasjonskrav 2

Documentation requirement: Credit rating based on the last known accounting data. The credit rating must not be older than six months prior to the deadline for submission of the request for qualification. And Financial statement with income and balance sheet for the last three completed financial years.
Kvalifikasjonskrav 3

Documentation requirement 1: Description of up to five contract performances of comparable size and configuration from the three preceding years. The description shall as a minimum include: - Short description of the contract performance. - Time of performing the contract. - Name and telephone number to the Contractor references. It is the Contractor's responsibility to document relevance to this procurement through the description. To ensure sufficient competition for the contract, contract performances older than three years may also be taken into consideration. Documentation requirement 2: Description of how the Contractor is organized for the fulfilment of this contract. The description shall as a minimum include: - Project organization, including high level information about the technical personnel the Contractor will utilize for performance of the contract. - Short description of the professional qualifications for the personnel that will be responsible for the performance of the contract. - If subcontractors - their role and what parts of the contract will be performed by subcontractors.
Kvalifikasjonskrav 4

Qualification requirement 1: The Contractor shall have a satisfactory quality management system. Documentation requirement 1: Description of the quality management measures implemented in the Contractor's organization. Or Copy of valid ISO 9001 certification, or similar. Qualification requirement 2: The Contractor shall have a satisfactory environmental management system. Documentation requirement 2: Description of the environmental management measures implemented in the Contractor's organization. Or Copy of valid ISO 14001 certification, or similar.

Tidslinje

Se aktive konkurranser som ligner