Beskrivelse
Requirement:
Under the award criteria, the contracting authority will evaluate the following
points:
1. Organisation and implementation ability
The contracting authority will undertake an overall assessment of the tenderer ́s fulfilment of the contracting authority ́s cleaning requirements in the contracting authority ́s requirement specifications (annex 1), including:
• How the tenderer will ensure and follow-up that the delivery is in
comply with the requirements set in annex 1
• Routines for how the tenderer will work with inspections, deviation management and reporting.
• Methods, equipment and resources intended to be used for
with the cleaning
• Temporary staff plans and training of personnel.
Emphasis will be put on whether the descriptions are concrete and project adapted.
2. Competence and experience
The Contracting Authority will undertake an overall assessment of the offered liability
work manager ́s competence and experience.
Documentation requirement:
The tenderer shall deliver:
1. Organisation and implementation ability
Completed Annex 2 - The tenderer ́s solution description.
The description shall be concrete and sufficiently detailed so that
the contracting authority will have a good understanding of the tenderer ́s approach and the ability to carry out the assignment in accordance with the requirements.
Tenderers shall, as a part of the response, state the minimum number of hours that the responsible work manager shall be obliged to have a physical presence at the contracting authority.
2. Competence and experience
Completed CV template in Annex 2 Annex 1.
Tenderers shall submit a completed CV for the offered responsible work manager.
The CV shall include information on the educational background, practice, courses and experience from similar assignments (reference project).
A minimum of 1 and maximum 3 reference project(s) shall be stated in the CV. The reference project(s) shall be described and documented sufficiently so that the contracting authority can assess the project ́s relevance, including the offered work manager's role and areas of responsibility in
the project.
Responses to the award criteria "Quality" and "Climate and environmental consideration", with the exception of responses to the minimum hours for the cleaning/work manager ́s physical presence and completed CV template, should combined be a total of maximum 4 A4 pages (line distance 1.0,
font size 10, typeface Open Sans) excluding any pictures or drawings for each sub contract. Responses beyond the stated page limit will not be evaluated.
Evalueringsmetode
The contracting authority will evaluate the following points:
1. Organisation and implementation ability:
* How the tenderer will ensure and follow-up that the delivery is in comply with the requirements set in annex 1
* Routines for how the tenderer will work with inspections, deviation management and reporting.
* Methods, equipment and resources intended to be used for with the cleaning
* Temporary staff plans and training of personnel.
Emphasis will be put on whether the descriptions are concrete and project adapted.
2. Competence and experience:
* The Contracting Authority will undertake an overall assessment of the offered liability work manager ́s competence and experience.
Documentation requirement:
1. Organisation and implementation ability:
* Completed Annex 2 - The tenderer ́s solution description. The description shall be concrete and sufficiently detailed so that the contracting authority will have a good understanding of the tenderer ́s approach and the ability to carry out the assignment in accordance with the requirements. Tenderers shall, as a part of the response, state the minimum number of hours that the responsible work manager shall be obliged to have a physical presence at the contracting authority.
2. Competence and experience:
* Completed CV template in Annex 2 Annex 1. Tenderers shall submit a completed CV for the offered responsible work manager. The CV shall include information on the educational background, practice, courses and experience from similar assignments (reference project). A minimum of 1 and maximum 3 reference project(s) shall be stated in the CV. The reference project(s) shall be described and documented sufficiently so that the contracting authority can assess the project ́s relevance, including the offered work manager's role and areas of responsibility in the project.
Responses to the award criteria "Quality" and "Climate and environmental consideration", with the exception of responses to the minimum hours for the cleaning/work manager ́s physical presence and completed CV template, should combined be a total of maximum 4 A4 pages (line distance 1.0, font size 10, typeface Open Sans) excluding any pictures or drawings for each sub contract. Responses beyond the stated page limit will not be evaluated.